CLIENT:
Ervia

MAIN CONTRACTOR:
Walls Construction

M&E ENGINEER:
Arup

ARCHITECT:

QUANTITY SURVEYOR:

Office Fit-out at Ervia Castlebar

This project consists of a two-storey type building which is divided in to four quadrants; Two quadrants on the ground floor and one on the first floor are shell and core, One quadrant on the first floor is occupied by tenants and is fitted out.

The full mechanical services installation included; Strip-out Works, Ventilation Systems, Air Conditioning, Natural Gas, Heating Systems, Domestic Cold and Hot Water Services, Drainage, Rainwater and Foul Drainage, Water Treatment, BMS, Commissioning.

The full electrical services installation included; Enabling Works, LV Distribution System, UPS System, Surge Protection, Distribution Cables, General Power Installations, Control Cabling, Information and Communication Technology, Emergency Lighting, Fire Detection and Alarm System, CCTV System, Audio Visual Systems, Testing and Commissioning.