CLIENT:
Intercontinental Hotels Group

MAIN CONTRACTOR:
McAleer & Rushe

M&E ENGINEER:
Caldwell Consulting Engineers

ARCHITECT:
ICA Architects

QUANTITY SURVEYOR:
Virtus Quantity Surveyor

200-Bed Holiday Inn Express at O’Connell Street Dublin

Findlater House on O’Connell Street is being converted in to the 200-bed Holiday Inn Express. The ground floor is completed with a new coffee shop unit. Floors one to six have 200 ensuite bedrooms and ancillary accommodation.

Mechanical Services include; Drainage, Domestic Water Services, Gas Services, Hot water Generating Plant, Extract Ventilation, Central Control.

  • The supply and installation of 5. No. Maxxflo Andrews condensing gas fired water heaters including the Flue pipe assembly, Temperature Controls, Space Heating System, Pipework and Fittings, Shelves and Plates
  • The ventilation services include the complete supply, installation, testing and commissioning including all fans, ductwork, grilles, louvres, dampers, fire sleeves etc.
  • Provided a new Domestic Water Services Installation
  • The gas supply, installation, testing and commissioning included the incoming gas supply, gas pipework and fittings, valves and gas emergency isolation. The gas used was MEDEM AGDS-4 Gas Detection type.