CLIENT:
Roscommon County Council

MAIN CONTRACTOR:
KD Group (PSCS)

M&E ENGINEER:

ARCHITECT:

QUANTITY SURVEYOR:

Energy Improvement Installation in Roscommon Leisure Centre and Swimming Pool

This project was the installation of Energy Improvement measures in the existing Roscommon Leisure Centre and swimming pool. KD Group were the Main Contractor and PSCS for this project.

The Mechanical Installation included; New rain water harvesting system with 75,000L over ground tank and connecting pipework; Installation of solar panels on pool roof and connection to 800L pre-heat tank, Connecting pipework into existing header in boiler house for connection to Energy Cabin.

Electrical work included; Upgrade to the lighting system, upgrading BMS system including installation of VSDs on existing pumps and AHU.

Builders work included; the construction of a 120m2 reinforced concrete base for the rain water harvesting tank, re-located oil tank and energy cabin