CLIENT:
The Board of Management

MAIN CONTRACTOR:
KD Group

M&E ENGINEER:
CB Engineering Consultants

ARCHITECT:
Aonghus McCann Architect

QUANTITY SURVEYOR:

Laboratory Renovations

This project was the renovation of two School Science Laboratories and converting them to Natural Gas. This work was carred out in protected structures  and in a live school environment while maintaining existing operations. We were the main Contractor on this project carrying out the following work;

Builders works: carpentry, blockwork, plastering, painting & installation of new laboratory furniture.

Mechanical Installation: space heating, domestic water services, Natural Gas Installation & Vulcathene waste pipework. Installation of Fume cupboards and chemical resistant extract ducting.

Electrical installation: Re-wiring of Science Laboratories, installling New lights and fire alarm.