CLIENT:
Westport Town Council

MAIN CONTRACTOR:
L&M Keating

M&E ENGINEER:
Patrick McCaul Consulting Engineers Ltd

ARCHITECT:
Westport Town Council

QUANTITY SURVEYOR:
Burton & O’Connor

This project involved the complete refurbishment and fit out of the Westport Town Hall. A 225 seat multi-use Cultural Space for the Performing Arts Workshop/Activities/Meeting Rooms/Exhibition space for the Visual Arts. The old Town Hall building was a protected structure.

The works included providing builders work, coordination and as installed drawings, Providing planned operations and maintenance documentation, demonstrating and training personnel, delivering to site, off loading, storing, setting in to position and transporting about the works.

The mechanical services consisted of the supply, installation and commissioning of the following; External Maine Water Installation, Gas Pipework Installation, Boiler House Installation, Gas Water Heater & Flue Installation, LTHW Heating Installation, Pressurisation Unit Installation, Radiator Heating Installation, Gas Detection Installation, Cold Water Storage Tank Installation, Cole Water Booster Pump Installation, Water Services, Sanitart Ware, Fire Extinguishers, Thermostatic Mixing Valve, Soils & Wastes, Heat Recovery Ventilation System, Concert Hall Ventilation System, Air Conditioning, Testing & Commissioning of Mechanical Services.