About the project

This project involved extensive mechanical refurbishments at ESB’s operational depot in Ennis. KD Group installed new heating and ventilation systems across office and technical spaces. Works were delivered while maintaining operational continuity in a critical infrastructure setting.
  • Client: ESB Networks
  • Category: Maintenance
  • Address: Ennis, Co. Clare

Project Information

KD Group was responsible for implementing HVAC, sanitary and controls systems in coordination with Conack and ESB Networks. This included complex ducted ventilation and connections from a prefabricated plantroom. The result was an efficient, modernised depot that enhances working conditions for ESB personnel and ensures compliance with new operational standards.

Client

ESB Networks

Our Role

Mechanical Contractor

Scope of works

Full installation of LPHW, sanitary ware, strainers, PICVs, DRVs

Installation of supply, return and extract ductwork including HRU and grilles

Mechanical plantroom connections and system pipework

Testing, commissioning and integration with packaged systems

Air conditioning and BMS controls installation

Main Contractor

Conack Construction

Consulting Engineer

Don O’Malley

Value

€265,000.00
ESB